Organizing for a Responsible Budget Homeowners can Afford
We’re encouraged by the Executive Board’s commitment to reducing the likelihood of special assessments. We share that goal and see the Ridge Park HOA Plan as a way to help the Board build on its efforts while caring for the community we love.
However, we’re concerned that the Board Budget leaves essential work underfunded and increases the risk of special assessments. The Ridge Park HOA Plan offers a different path: affordable assessments, funding for future repairs, and steady progress toward a well-maintained, financially secure community. Working alongside the Board and our neighbors, we want to catch up on maintenance, keep Ridge Park beautiful, and protect home values. We are committed to working with the Board to discover the best path forward for our community together.
The Ridge Park HOA Plan builds reserves for the long term.
- Growing contributions – The Ridge Park HOA Plan increases reserve contributions for a couple of years, then raises them with inflation to keep funding sufficient.
- Affordable – An assessment increase of about 19% above inflation, phased in over four years, funds operating costs and all scheduled reserve work under the Ridge Park HOA Plan. After that, assessments rise only with inflation.
- Supports Mortgage Eligibility – The Ridge Park HOA Plan keeps reserve contributions above Fannie Mae’s 15% benchmark throughout the projection.1
The Board Budget keeps assessments artificially low.
- Declining contributions – The Board Budget reduces reserve contributions over time, even as inflation drives repair and replacement costs higher.
- Fails Mortgage Eligibility Benchmark – The Board Budget falls below Fannie Mae’s 15% reserve benchmark in later projection years, putting mortgage eligibility at risk. Fannie Mae’s minimum rises to 15% for Full Review condominium loan applications dated January 4, 2027, onward, unless an acceptable reserve study supports an exception.1,4


The Ridge Park HOA Plan covers essential work and catches up on deferred maintenance.
- Painting – The Ridge Park HOA Plan funds painting every 10 years, as recommended by the pros.5
- Siding – The Ridge Park HOA Plan funds complete siding replacement beginning with the next painting cycle, addressing our original, rotting siding.
- Landscaping and drainage – The Ridge Park HOA Plan funds annual landscaping to steadily improve drainage and appearance.
- Asphalt – The Ridge Park HOA Plan funds a lower-cost mill-and-overlay in 10 years, renewing the entire asphalt surface, followed by full asphalt replacement in 30 years.
The Board Budget leaves essential work underfunded.
- Painting – The Board Budget schedules the next painting cycle for 12 years from now, then totally omits building painting for the rest of its 30-year projection. Professional paint formulators advise that exterior repainting is typically needed every 7–10 years, depending on climate and paint, helping protect our common elements.5
- Siding – The Board Budget lacks meaningful replacement funding for our original siding, now more than 40 years old and rotting. Siding manufacturers identify rot as a sign that siding needs replacement.6
- Landscaping and drainage – The Board Budget allocates less than $25,000 over 30 years, leaving landscaping and water management needs underfunded.
- Asphalt – The Board Budget delays mill-and-overlay to 15 years and never collects funds for full asphalt replacement.
The Ridge Park HOA Plan funds long-term needs and reduces special-assessment risk.7
- Threshold funding – The Ridge Park HOA Plan uses threshold funding to maintain sufficient reserves and reduce the risk of special assessments.2,3,7
- Ongoing replacement costs – The Ridge Park HOA Plan accounts for recurring repair and replacement obligations beyond the projection period, using Community Associations Institute (CAI) reserve-planning methods.2,3
The Board Budget relies on risky funding assumptions.
- Baseline funding – The Board Budget allows reserves to approach zero. CAI warns this increases the risk of deferred maintenance, special assessments, or loans.2 Since August 3, 2026, Fannie Mae’s reserve-study exception excludes baseline funding and requires the study’s highest recommended allocation.1
- Neglects Costs beyond 30 years – The Board Budget omits expenses beyond its projection. CAI calls for identifying long-life components and addressing their funding; later timing does not erase the obligation.2,3

Bibliography
- Fannie Mae. Lender Letter LL-2026-03: Updates to Project Standards & Property Insurance Requirements. March 18, 2026, p. 3: reserve study and allocation requirements.
- Community Associations Institute. An Explanation of CAI’s Reserve Study Standards. 2025, pp. 8, 12: long-life components and baseline funding risks.
- Community Associations Institute. Reserve Study Standards. July 2023, pp. 8–10: components and funding plans.
- Fannie Mae. Selling Guide, B4-2.2-01: Full Review Process. August 5, 2026: project eligibility and reserve requirements.
- Sherwin-Williams. How to Paint a House Exterior. “How often should I paint my house’s exterior?”: typical repainting interval of 7–10 years, depending on climate and paint.
- James Hardie. 8 Tips for Choosing a Siding Contractor. “Does My Home Need New Siding?”: rot is a sign that siding needs replacement.
- Nordlund, Robert M., PE, RS. Why Percent Funded Should Matter to You. Association Reserves, February 5, 2019. Explains the relationship between reserve percent funded and special-assessment risk.
- For Board Budget: Ridge Park Budget Projection. Google Sheets, “Reserves” worksheet. Contact Ridge Park Luxury Condominiums Owners’ Association, Inc.